Save the certificates. A valid X.509 certificate is required for Device Manager to connect to the routers and DA gateways. Convert the DTLS server ECC key to PKCS8 standard. Industrial Asset Vision IoT Operations Dashboard Documentation. on it from IOT-DM. Grid Routers (CGR 1000 or router) running Cisco IOS, Cisco 809 Industrial Integrated Services Routers (IR800), and Cisco 500 order table. LastRegReason: Reason for last registration. You need to monitor the IR500 status, activity, and performance. The mini-dashboard (see Figure 1) appears at the top of every Device Manager page, and provides the information listed in the following table. attached to an interface. On the Device Manager main page, click the Ethernet port to display the popup menu and select, On the On the Device Manager main page, click a serial port to display the popup menu and select. Import Certificate Select Import IOT-DM certificates Select FND radio Connect to the IR500 as described in Connecting to the IR500 with a Work Order or Connecting to the IR500 Without a Work Order. Configure or modify general, MAP-T, and serial interface settings. Beacon Version: The beacon's version from the FAR. ReqSignedPost: Whether request signed post. authorization message which contains wireless authorize console TLV and FND signature Copy the above server_ec.key and Program the Target node with following certificates, keys and config.xml: 1. root_ca_ec.derRoot CAs public key. On the Device Manager main page, click the Firmware tab. This function is disabled by default. Broadcast Period: Period of the broadcast. After you confirm the installation, the image installs automatically on the device. Baud When the door status indicates a status of System Casing Open , you must physically access the CGR 1240 to verify the status of the door. shown below. Local Basic Mapping Rule: These fields specify the IPv6 and IPv4 prefixes used to address MAP-T nodes inside the MAP-T domain. To refresh the display, click the refresh icon in the upper right corner of the View Details window. Last Changed: The time (in hundredths of a second) since the device changed the PAN. Maximum Auth Interval: The maximum authentication interval. Operating without IoT-FNDWhen you do not have IoT-FND operating in the network or do not want to connect to that system, will execute only the communicated authorize TLV commands. View or modify settings for TCP Raw Socket Sessions. These can then be easily customized using the open-source Freemarker template language on which they are based. From this page, you can connect to the IR800 router either with or without a work order. Data Start Device Manager and click the Modules tab. Verify access to a device (IPv6 address) from the IR800 by using the Ping option to check link connectivity and quality. Cisco IoT Device Manager Installation and User Guide, Release 5.x, View with Adobe Reader on a variety of devices. IOx terminal on the IOx tab. another screen and you need to provide IPV6 address of the relay node and FTT [rfc6550], LinkEtx: Expected transmission count of the link. To terminate the session, click the Stop Session button. Device Manager displays messages to inform you of the reboot status. Rx Bytes: Number of bytes received over the raw socket connection. Mesh (IR510) should be Release 6.2.19 and later. It will post bank controllers, reclosers, or other SCADA devices. And stay connected with Cisco DevNet on social! CertFingerprint: Fingerprint of the certificate. Connectivity Diagnostic operations - Identifies whether the device connectivity is up to the mark with other interfaces on Packet All rights reserved. The following figure shows the common page elements and controls for the Device Manager pages. On the left-hand side of the Dashboard, you can view Security Level: Level of security corresponding to the protection offered (02). After connecting to the IR500, Device Manager displays the Dashboard. The IoT-FND administrator creates user accounts for the field technicians who use Device Manager to download work orders from IPV4 connectivity from IoT-DM to relay node is not supported. server.csr files to Linux1 CA Port : Port number of the client/server connected to the device. Update the CGR 1000 configuration with a provided configuration file, and then reboot the router with the new configuration. (upper right) on the Device Manager and verify that the door status displays System Casing Closed . the new jbossas.keystore file. In IoT-Device Manager Release 5.6, an authorization security procedure is introduced Number of IPv6 to IPv4 Transactions: The number of IPv6 to IPv4 address translations. IPv6 prefix. IPv4 address. A firmware image update must be uploaded and installed on the CGR 1000. authorization response received from target node, IoT-DM will process the same and start Linux node on the IR500 device should have UDP server running on 8335 port which will be used to connect via IOT-DM Client If some fields are not postable, the post operation will fail. Currently, FTT wireless console session with target nodes from IoT-DM Work order number, work order name, and time remaining to complete the work (Device Manager is connected to a router using Select the downloaded FTT type work order and click the Connect button. Use the Config You Master: Whether the endpoint is master (yes/no). Prefix : IPv4 prefix that specifies the IPv4 subnet selected to address all IPv4 nodes in a MAP-T domain. SigBadAuth: Count of bad authorized signatures. To view Enrollment settings (EST) information: On the Device Manager main page (Dashboard), click the EST sub-tab. Type : The serial interface type. Sample Target node configuration: decxu_sec.xml. SigNoSync: Count of signatures that are not synchronized. When there are issues related to WiMAX connectivity, (for instance, after a storm, the WiMAX antenna may not be pointing in On the left-hand side of the Dashboard, you can view the front and rear of the router. Dio Max Interval: Maximum DIO interval in RPL protocol. IP View the information in the Ieee80211i Status area: Enabled: Whether the 80211i protocol is enabled. (ms) : The time interval between each TCP packet creation. Baud On the Device Manager main page, click the Connectivity tab. sexual orientation, socioeconomic status, and intersectionality. With the combination of these products, it is possible to easily and securely connect Remote and Mobile Assets. Control : The use of flow control on the line. FTT is not supported when IR510 is connected to COM Port. ports while hovering over them. to the device. The two serial ports also have popup menus with the option to view interface details. the router and any installed Connected Grid modules. IPV4 authorization TLV 342 message byte array from FND through work order. Back Off Timer: Timer for back off algorithm. If not, a seperate screen would be shown Login to FND and navigate to Admin -> certificates -> certificate for (See TxFec: Whether forward error correction (FEC) is enabled. http://www.cisco.com/go/ir500 Enter DTLS server Common Name, give permissions to GET and Immediate: Request authentication immediately. If the ping is unsuccessful, The After connecting to the router, Device Manager displays the Dashboard (see the following figure for an example of IR809 dashboard). the field. Default value is 115200. You need to review the CGR 1000 configuration information to troubleshoot the CGR 1000. Twitter @CiscoDevNet | Facebook | LinkedIn, Secure and Simplify Your Programmable Edge and Industrial Sensors. details. on the interface: In the confirmation dialog box that appears, click, On the Device Manager main page, click the, On the left of the Firmware page, click the Upload icon and select an image to upload. Verify access to a device (IP address) from the CGR 1000 by using ping to check link connectivity and quality, and initiate with Cisco Resilient Mesh Release 6.0 and later. IPV6 Device Manager disconnects and displays the Device Manager opening IoT-FND stores the reported properties and metrics. The IR500 also provides remote connectivity to IPv4 DA devices Device Manager can manage CGR 1000 routers in Connected Grid field deployments operating with or without IoT-FND: When operating with IoT-FND, a Device Manager user can retrieve work orders from the system as well as perform all supported Current Time: The current date and time. Use the Config You can view details about IR500 settings and status from the subtabs of the Dashboard. Manager connects to the IR809 by using a secure Ethernet link and to the IR829 by using a secure Ethernet or WiFi link. is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, Device Manager from the IR500. Type : The serial interface type. Connect the serial cable to the IR500 console port. Open cmd prompt and go to the folder where all 7 files were copied: Execute the below command to generate bin file for target IR510. request from a legible source. Using the built-in Secure Equipment Access (SEA) feature of IoT Operations Dashboard, you can then use RDP, VNC, SSH or HTTP/S to securely access remote connected equipment using just the dashboard and your browser. For more information about IR500, see http://www.cisco.com/go/ir500 . Dodag VersionNo: A sequential counter that is incremented by the root to form a new DODAG version. Metric: The value calculated by rank / the weight value of the rank + size / the weight value of the PAN size. Failed On the RAW TLV tab, every fields of a TLV will be displayed. [rfc6550 and rfc6719], LinkEtx: Expected transmission count of the link. Time The CSMP Steps to Install Custom Certificates (jboss) in the Browser Client for FND, Rename the following files to keep as backup jbossas.keystore, vault.keystore and in conjunction with IoT-FND, follow the steps in Setting Up the IoT-FND Connection. 0=no security, 1=802.1x security. Click the Get ALL TLVs button will display information of all TLVs in the list. 5556 for DTLS server. On clicking this button, a dialog box will be displayed to show the details of the ping operation You can connect to the Linux/IOx nodes on the IR510 device and execute commands or troubleshoot issues locally by using the Connecting to the IR500 with a Work Order, Connecting to the IR500 Without a Work Order, Changing Serial Interface 0 Settings (DCE), Changing Serial Interface 1 Settings (DTE), Generating and Uploading Bootstrap Configuration, Offline AuthorizationFTT Secured Wireless Console for IR510, Secured Wireless Connection to Target Node, Running Point to Point Test Between Two IR510s, Cisco IR 500 Series WPAN Gateway and Range Extender Installation and Configuration Guide, On the Device Manager opening page, click. DHCP Check - Verifies whether the device has the DHCP lease period and got IPV6 address assigned. Cisco IoT Field Network Director (Cisco IoT-FND) manages multiple CGR 1000, IR800, and IR500 devices, whereas Device Manager Manage Organization (Informational Only), Scenario 3. You can also view the status of ports while hovering over them. Prefix Info : The configuration group that IoT-FND uses to manage devices in bulk. view the status of Ethernet ports and modules while hovering over them. After closing the door, click the Refresh icon Once in operation, Dashboard provides an Operations Technology (OT) focused user experience and is simple and easy to use. private key and convert into der format. A dialog box appears indicating that the IR500 is attempting to ping the target IPv6 address. 6LoWPAN. Before you generate certificates and keys for relay and target node, make sure you have over the IPv6-based Resilient Mesh by using Mapping of Address and Port using Translation (MAP-T). To connect the laptop to the IR500, first ensure that you meet these prerequisites: You have installed the Device Manager software as described in Installation. three certificates with alias of ca_cert, server_cert, server.key: 1. root_ca_ec.crtRoot CAs public key, for verifying the client certificate. View the following information in the WPAN Status area: Interface Index: Identifies the WPAN interface. Of all the services and products offered by IOD, we will discuss, Cisco Edge Device Manager (EDM) and Cisco Secure Equipment Access (SEA) in this demo. tasks on the main page (see Figure 1). After the test is completed, the results are dispalyed for RSSI, Error Rate, ETX, Noise, Modulation, GPS, and Timestamp. authorization message, target node will reject the request. if you do not want to enter the details of the FND server. Please re-install LINUX image and try again. Auth Address: Authenticator server address. In the Network Interfaces area, view the settings and status for the IR500 interfaces: IP Address: IP address assigned to the interface. User Guide, North Bound API User Guide for the Cisco IoT If the certificate is expired while connecting to FTT, you will get an error as Start the Device Manager, connect to the router, and then check connectivity The configuration bin file is created and a dialog box appears showing the location of (Optional) If you want to search a specific neighbor, enter the physical address in the Search Neighbours text box. and then update the router with the new image. For more information, see Cisco Connected Grid Network Management System User Guide, Release 2.1. Device Manager can manage IR500 gateways in Connected Grid field deployments operating with or without IoT-FND: When operating with IoT-FND, a Device Manager user can retrieve work orders from the system as well as perform all supported Use the Select channel drop-down menu to select one of the following channel options. When you click the RAW TLV tab, all TLVs (including newly added TLVs) will be displayed as a list. A 4G LTE module is being added to a CGR 1240. certificate of root_CA[client.crt]. work order type. metrics, and consider other properties such as constraints. (See Importing Certificates.). You can import certificates through the Device Manager opening page. To view or change ACL configuration settings: Click the ACL tab and view or modify the settings. IAV includes an end-user dashboard application, network management tools, LoRaWAN network devices, and Cisco industrial sensors for collecting environmental and GPS location data. will be displayed. (CGR 1240 only) The door of the CGR 1240 is open. In this SSID: Service Set Identifier (SSID) used to differentiate networks. Cisco Blogs / Developer / Secure and Simplify Your Programmable Edge and Industrial Sensors. Ethernet Link Check - Status of Ethernet will be displayed. The serial-to-USB adapter and serial cable are not supplied with the IR500. ROMMON is up and running. Function: The function of the device in the Resilient Mesh network. Device Manager is a Windows-based application that field technicians can use to manage the CGR 1000 running Cisco IOS over TLS handshake. Download the Base64 version of "Certificate for CSMP" from the FND To view or change MAP-T configuration settings: Click MAP-T Settings and view or modify these settings: Default Mapping Rule: These fields specify an IPv6 prefix used to address all destinations outside the MAP-T domain. the created configuration bin file. View the following information in the RPL Parent area: IPv6 Address Local: Unique local IPv6 address of the parent. You need to bring up, shutdown, or reset the Ethernet interface. Objective Function (OF). The following user accounts are provisioned at the factory: The following table shows the required privilege level for the listed tasks. After all diagnostics are completed, successful operations will be shown as green and failed ones will be shown as red. from IoT-DM to relay node is not supported. each task. Both models Once the connection to IR510 is established The following figure shows the Diagnostics tab. of IOx node in the device. and privilege level 15 for privileged EXEC. Client will use the root CAs public key to verify it. This makes it straightforward for you to create a custom configuration form which is specific to your solution with ZTP, security and solution-specific configuration options and in-form guidance. privilege level 15 (default privileged EXEC mode) can perform with Device Manager and provides an example of when to perform the following prerequisites met: Follow these steps to generate certificates and keys for relay and target node: On Linux1, generate Root_CA and key with self-signed certificate, using the MAP-T IPv6 Address: Contains the IPv4 address used by devices external to the MAP-T domain to communicate with the IR500 Raw The IOx node on IR510 should already have been setup via FND or manually, so that you can perform the management operations Using this secure connectivity as a foundation, that same dashboard then enables you to extract, transform, govern and deliver data from IoT edge devices to the cloud with Cisco Edge Intelligence, install and manage your containerized edge applications and to deploy a broad range of industrial IoT sensors with Cisco Industrial Asset Vision. Click the Upload Config button. RegSucceed: Count of successful registrations. the right direction, which can cause RSSI/CINR values to drop), view details for the WiMAX module to help troubleshoot the Address: Configure IPv6 address on relay node ethernet interface and then program it with used with MAP-T. For more information about MAP-T, see Cisco IR 500 Series WPAN Gateway and Range Extender Installation and Configuration Guide. The Ethernet port has a popup menu with options for managing the interface and viewing interface While starting the wireless console, IoT-DM will transfer the Login again with the same work order and navigate to PToPTest tab. Update the generated vault tags in EA At the top of the screen, a mini-dashboard provides additional details on the router as detailed in Table 1. Interval : The number of seconds between data updates. Details . Enable Upload a copy of a software image onto the CGR 1000 for immediate installation or for a deferred update of the image. Prefix Support for IR809 and IR829 routers and IR510 gateways. Start the Device Manager and review the router graphic on the Once the ftt.keystore is imported, they can be viewed in the View Certificate tab browser view certificate or through login to FND and choose Admin Certificate After importing ftt.keystore, you need to connect to FTT to view the certificates; Edge Device Manager Getting Started, Scenario 2. TLV 341 and connect to the respective target node and establish DTLS channel. device is on the network and provides a mechanism for pushing management configuration information to the device. To set the running image as the backup image: On the right of the Firmware page, click the Set Backup icon. Copy the ssm port and password in cgms.properties: Update the generated ssm properties in vim On the right-hand side of the Dashboard, you can view details about the device settings and status (see Viewing Settings and Status). This feature cannot work when IR510 is connected to COM port or connected Learn more about how Cisco is using Inclusive Language. Click the BootStrap Config tab and then click the Generate Config subtab. Last Changed: The time (in hundredths of a second) since hearing from the neighbor. Start the Device Manager and check the status of the door (top of the main IR809 must have IPv6 option enabled to connec with work order. This chapter provides an overview of the Cisco IoT Device Manager (Device Manager or IoT-DM) for Cisco 1000 Series Connected ReqSecLocalPost: Whether request security local post. Use the Dashboard to check the status of the IR800 hardware, such as power and device ports. To bring up, shut down, or reset the Ethernet interface: On the Device Manager main page, click the Ethernet port to display the popup menu and select the operation you want to perform Route Index corresponds to the same index in the IP Route table. Bit : The asynchronous line stop bit. Use predefined eCVD configuration forms to leverage Cisco-provided zero-touch provisioning (ZTP) and best security practices. IoT-DM uses port number otherwise you will see the warning message to connect to FTT in the View Certificate IoT-FND. downloaded file in CGMS under the following path /opt/certForWeb.bin. This greatly simplifies solution development, especially for those real-world proof-of-concepts and in-field development and update activities that are often so challenging and time consuming. the respective work order. Rate : The data transmission rate in bits per second. On the Device Manager main page (Dashboard), click the MAP-T sub-tab.

Sitemap 20